First After the Floor

 

One of the longer timelines was the placement of the cantilevered iron beams to pull the wing tips up to keep the entire roof angled as designed. To this end the roofer came and pulled the roofing back in key sections of the roof where the beams lay until they were finally secured creating a solid cantilever over those south facing stone walls on both the east and west ends. It turned out there was a long metal plate in the facia at both wing tips. Those ends of the beams were welded to them. The other ends of the beams were bolted into the composite roof rafters in each end bedroom.

32StripAndBeam

This photo is after stripping a stretch of roof from each wingtip back across the south stone wall it would be cantilevered over. You can clearly see the failing of the wing tips to stay up as they were supposed to. These two custom beams were 25 feet long.

 

Weaving Team Progress

 

When I listed the various tasks for the various teams, The three main teams (AAA, NW-Team, and SW-Team) worked pretty much start to finish. AAA (Gary’s team) had to get most of the inside plumbing and radiant floor work done so the new floor could be poured, and the other teams could begin. Similarly, he had critical work for the new cantilever before the roof could be completed. The rest of the time AAA performed the rest of the team’s long list of work. Similarly, the NW-Team interfaced with various parts of both the AAA team and the SW-Team. Only the SW-Team was able to work on a single task and goal. Their only constraint was matching the pace of the NW-Team so they could get the new south wall headers in place as the NW-Team got the new composite roof rafters built out.

 

Team interdependencies

 

AAA – AA Armadillo owned by Gary Stoltz

 

I wish to give credit to the incredibly superior efforts of him and his team (but mostly Gary). He was first to start the actual restoration with the floor and pool plumbing and almost last to complete as he completed his many projects not least of which was securing the roof wind tips with the metal beams. His work was an intimate portion of the success of the restoration.

 

Me

 

My largest part in this outside of taking on the project was to initially remove the south balcony walls freeing up the roof rafters for their being beefed up to meet 1982 codes for snow country. The following photo, with the middle of three south walls removed partially, shows how effectively these walls kept out light from the solar south wall. The south walls were even worked up between the old rafters keeping even a little overflow light out. My greatest accomplishment was the restoration of the balcony after the other teams had completed their work (not including making the entire restoration happen of course).

 

33Oldartitions

I managed to bring down the walls in sections so I could move them around the upstairs keeping them out of the way of current raftering and other upstairs projects like the skylights and redo of the north window wall.

 

There were seven partition walls in the balcony I had to deal with. Four ran north and south attached to the current rafters and three across the south side of each room as you can see in the photo above.

34OpenBalcony

This is a good place for several comments. By the time the roof rafters were all revamped and the north window wall supports were upgraded to match in width the new composite standard (2”, 1”, 2”, 1”, and 2”), we ended up with the original balcony which the Jacobs did have until it was eventually mapped into what they needed, a 5-bedroom house. The fin radiators were needed due to vermiculite insulation only filling the hollow limestone walls down to ground level. This meant these rooms had no insulation down to frost depth on the north stone wall. The radiators worked well in the world of 200+ degree radiant floor water. They would have been useless in the new world with 140-degree water in the floor being just about right since we were no longer sending heat out of the house down through the floor anymore. The new layering under the radiant floor finally had insulation. Oh, and this was the upstairs wood shop. We had another downstairs. Two of the red poles used to suspend the front of the balcony can be seen here. The back ends of the balcony rafters were in notches left in the stonework when the limestone was al laid in 1947.