Bobcat Access
As had already been decided, the radiant floor was first as it provided the footing for the front window wall. We are talking of 1500 square feet of floor. The tunnel was too narrow to give access to a bobcat for doing the heavy work. This meant it had to come in from the east along the front walk. However, the east planter restricted the path. I dismantled a large portion of it with concrete chisels and removed the stones and stacked them in reverse layers away from construction traffic. I stacked them in the order they were removed easing my restoration of the planter to much as it had been.
New Radiant Floor
Removal of old broken and inefficient radiant floor
This was the goal from the planter removal. We finally had made an access for the bobcat. It is not every day you see a bobcat in your living area.
I like this photo for several reasons other than just being cool. They had to think about how to best remove this 1500 square feet of radiant floor. You’ll note that the pipes were just lying under the concrete in a simple rock bed at about 30” spacings. Note two more things. The shadows show the house around noon. You can clearly see the dark space on the west end from where the stone wraps around to the south side of the house on both the east and the west ends which made those areas dark. The pool and the floor were one and thus I had to replace both the floor and the pool.
Once the planter was cleared, they brought in the bobcat to break up the old slab which sat above the uninsulated gravel bed with the old iron pipes on top of that bed. The double door by the dining room table area near the tower was the transport path for the bobcat in and out with its loads. They then leveled the crushed rock and used sand to make a new base surface for creating the new floor. The concrete firm was now out of the picture until it was time to pour and color the new floor.
We now could see the sand bed on which the new floor was poured. Once we had the vapor barrier and the insulation fit, it was partially pulled back to allow plumbing to run to both pools using the same filtering and heating system installed for the inside pool.
Insulation and vapor barrier
Part of the improved performance was that this time both insulation and a vapor barrier, integral to the new floor, were established. It took some time for pool plumbing, new electrical runs, and preparing the radiant floor to be poured with the plumbing within it.
Running pool plumbing under new floor base
To make both pools more usable four 2” PVC pipes were run to both pools and one pair at any one time could be both filtered from equipment in the utility core and heated. This solved the filtering issue which had always existed in using Herb’s outdoor plunge pool and, with the rest of the inside plumbing for the inside pool, a usable hot tub with both air and water jets. Obviously, such use is at the whim of the owners. I personally had many enjoyable nights with some wine and a book in the inside pool. I was going to get some use out after all the costs associated with replacing the design element. The pool circle to the south and west balanced out the tower circle which was north and east. This was a kind of a Yin/Yang balance. The floor and the pool were mated as one. It should be noted that prior to completing the inside pool, I too had a wood cover filled with plants (half circle of course).
New Electrical runs
It is like this, when your house is built on a slab, no matter how glorious the result, you must do everything that you might want to do at the time of replacing the slab. Sigh, how many people ever replace the entire slab their house is built on? Well in this case the pot of gold (literally considering historic 1980 heating costs of near $4,000) is a modern and efficient radiant floor. I have had years of enjoying this radiant floor (old and the new one) and there is no nicer heat source. We replaced a major portion of the house electrical since it was in the radiant floor we ripped out. New radiant tubing and wire mesh
We were almost ready to pour the new radiant pool here. The plumbing around the inside pool was still being finished. Here we can see the exact makeup of the new radiant floor. On top of a sand bed, we have the vapor barrier and insulation we saw earlier. The next layer is the new wiring which is all in conduits should issues arise in the future. I made sure to get an outlet int the main gathering area. Next, we see the special tubing for radiant floors and a wire mesh. The filled tubes would lift the mesh a bit for a sound and solid new radiant floor.
PourFloor coloring process
There were many attempts during our time with the house where we made attempts to add some color to the gray concrete. This included me on the hands and knees with a colored paste wax. Though it took many hours, we still had a grey floor.
The do-over on the floor meant a chance to have the floor the deep red it was meant to be without being a washed-out dyed concrete. I’d like to say where this solution was found. It’s not like in 1982 you could google it. But a recipe of sand and dye mixed into the top of the freshly poured concrete. Something like seven pounds of dye, seven pounds of Portland cement, and another seven pounds of silicon sand to about every 10 square feet. We had to wait for the floor pour before we would know it had finally gotten the color as it was meant to have.
Please note. This may have been 7 pounds Portland cement to 7 pounds of dye.
Finishing work utilizing this mixture yielded the longed-for deep red. FINALLY! They still needed to do the final finishing to the surface, but it worked. This was a huge win for the house. Later when we got to the final curtain system for the south solar wall, the house got another huge win.
|